Council correspondence · Transcript
IR 44563: review decision and disclosed assessment records
Review decision dated 12 October 2026. Includes the original 15 August request, the 14 September response, January leadership reports, decant checklist, scoring template and audit information reproduced in the campaign correspondence. Council redaction labels are retained. This is a text transcript, not a scan of the original letter. Line breaks and table alignment may differ from the source.
Download text transcript ↓Aberdeenshire Council Freedom of Information (Scotland) Act 2002 (“The Act”) Decision Notice – Section 21(5) Application by K. Forbes Information Request: 44563 Dear Mr. Forbes, In accordance with section 21(1) of the Act, the review panel of Aberdeenshire Council has considered your application for a requirement for review received on the 14th of September 2026. In accordance with section 21(5) of the Act, the review panel herewith gives notice in writing that the decision complained about dated the 14th of September 2026, required amendment to reflect that further information was provided. A statement of the reasons for the decision as required by section 21(5) of the Act is appended. Application for a decision by the Scottish Information Commissioner: By virtue of section 47 of the Act, a person who is dissatisfied with a decision notice issued under section 21(5) or (9) of the Act, may apply to the Scottish Information Commissioner for their decision as to whether, in any respect specified in that application, the request for information under section 1(1) of the Act, has been dealt with in accordance with Part 1 of the Act. An application to the Scottish Information Commissioner must be made in writing (or in another form having some permanency e.g. a video / tape recording) within six months of receipt of a section 21 decision notice from Aberdeenshire Council’s review panel. When applying to the Scottish Information Commissioner to make a decision with respect to a section 21 decision notice, you must state your name and address for correspondence. You must also specify: (a) The request for information to which the requirement for review was made to Aberdeenshire Council relate. (b) The matter which gives rise to your dissatisfaction and your request for review; and (c) The matter which gives rise to your dissatisfaction pertaining to the decision given in the section 21 decision notice. An appeal can now be made online at the following address: https://www.foi.scot/appeal Yours sincerely, Clerk to the Review Panel Aberdeenshire Council 12th October 2026 Further Information: The Scottish Information Commissioner can be contact at: - Scottish Information Commissioner Kinburn Castle Doubledykes Road St. Andrews Fife KY16 9DS Telephone: 01334 464610 Fax: 01334 464611 Email: enquiries@itspublicknowledge.info Web: https://www.foi.scot/appeal Appeals against a decision of the Scottish Information Commissioner: Section 56 of the Freedom of Information (Scotland) Act 2002 (“The Act”) provides an appeal on a point of law may be made to the Court of Session. (a) Against a decision of the Scottish Information Commissioner (under subsection (2) of section 49 – i.e. where the Commissioner determines that a decision does not require to be made) by the person who applied to the Scottish Information Commissioner to make such a decision (i.e. an applicant); (b) Against a decision of the Scottish Information Commissioner (under subsection 3(b) of section 49) by an applicant or by the Scottish Public Authority in respect of which the decision was made; or (c) Against a decision which resulted in the giving of an information notice or an enforcement notice to a Scottish Public Authority. Statement of Reasons - 44563 The Review Panel had before it the initial request, the service response, the request for review and further submissions from the service. The requester was given the opportunity to make further submissions but did not do so. The Review Panel noted that as part of their submission to the Review Panel, they provided further information to the Review Panel. The Review Panel agreed that this could be forwarded to the requester and this is attached. The Review Panel considered that drafts of the assessments prepared as part of the consultation proposal fell within the exemption contained in section 30(b)(i) of the Freedom of Information (Scotland) Act 2002 (“FOISA”). The assessments in question were in draft form and were subject to review and approval. This process involved further discussions and advice being provided before finalisation of the consultation proposal. The Review Panel considered that release of that information would be likely to prejudice the free and frank provision of advice and exchange of views in terms of this process as it would likely have an adverse impact on the discussion on such proposals if it was felt that any option or point of discussion was open to publication. While there is a public interest in disclosure of such information, public bodies must be allowed to freely discuss matters of public importance in private before taking a final position. The Review Panel considered that the public interest in disclosing the information sought was outweighed by the public interest in allowing matters to be discussed freely in a private setting. The Review Panel noted that the requester had raised concerns in respect of the searches undertaken. The service provided the relevant audit form to the Review Panel and the Review Panel agreed that these could be forwarded to the requester. confirm the appropriate searches undertaken by officers in this case. The Review Panel determined that the original decision notice required amendment to reflect that further information had been provided to the requester and that clarification had been provided regarding the exemption referred to. Further Information - 44563 Response issued by service on 14/09/26: Dear Kevin Forbes Freedom of Information (Scotland) Act 2002 (“The Act”) We refer to your request dated 15/08/2026 09:08. We confirm that the Council holds the following information, which we believe satisfies your request. In correspondence sent to Stephen Flynn MSP, Aberdeenshire Council stated: “As previously advised, the Council completed its preliminary assessment of alternatives in April 2026, prior to the Education and Children’s Services Committee considering whether work should proceed towards a statutory closure proposal.” Please provide all recorded information relating to that April 2026 preliminary assessment of alternatives for Banchory-Devenick School. This should include: The completed preliminary assessment; - Details contained within the SLT and ECS reports previously provided. Options checklist used for emergency decant attached as Appendix 1. Any draft versions; Not held Any options appraisal; Preliminary options are contained within SLT and ECS reports. A full Options Appraisal is still ongoing and will form part of the proposal document for statutory consultation which is currently being prepared. Any scoring matrix; The Scoring matrix template which is used to support the options appraisal, which remains in progress, has previously been provided. Any assessment of reasonable alternatives to closure; any assessment of educational benefits; as above Being prepared as part of the statutory consultation proposal document. Any assessment of community impact Being prepared as part of the statutory consultation proposal document. Any assessment of travel implications Being prepared as part of the statutory consultation proposal document. Any record showing why closure was considered the most appropriate response Being prepared as part of the statutory consultation proposal document. Any emails, meeting notes, briefings, reports or attachments discussing the preliminary assessment; We have nothing additional to add. Any records showing who prepared, reviewed or approved the assessment; SLT report is signed and dated. Any records showing whether the assessment was provided to, considered by, or summarised for the Education and Children’s Services Committee. ECS report and minutes are available on the website. Please contact me as the officer responsible for responding to your request if you have any further queries. If, for any reason, you are not satisfied with this response, please refer to the further information below. Yours faithfully Freedom of Information Co-ordinator Education & Children's Services: Education Further Information: Aberdeenshire Council’s Review Procedure under the Freedom of Information (Scotland) Act 2002 and the Environmental Information (Scotland) Regulations 2004 can be accessed at the following link: http://www.aberdeenshire.gov.uk/council-and-democracy/foi-review-process Documents and items referred to in the response: Meetings: ECS Committee Meetings ECS Committee Meeting: 26/03/26 – Report, IIA and Approved Minute - Item 9 https://aberdeenshire.moderngov.co.uk/ieListDocuments.aspx?CId=153&MId=865 3&Ver=4 ECS LT Meeting ECS LT Meeting – 08/01/26 – Report Please see Appendix 1 SLT Meeting SLT Meeting – 28/01/26 – Report Please see Appendix 2 Documents: Options checklist for emergency decant Please see Appendix 3 – as attached to the response. Scoring matrix Please see Appendix 4 ECS LT Report to ECS LT Date of Meeting: Title of Agenda Item: Responsible Person & Contact Details: Which Heads of Service/ Area Managers have seen sight of the finalised report Summary: 8 January 2026 Banchory Devenick School – Heating System Failure S38(1)(b) Learning Estates Team S38(1)(b) Anne Marie Davies MacLeod, Head of Resources and Performance Allan Whyte Head of Service, Property and Facilities Management This report identifies critical risks associated with the heating system at Banchory Devenick School and the associated trends of roll, including its future viability. Background Papers: N/A Decision/Action required: Estimated Time to Cover 15 mins Item: All electronic papers should be forwarded to: S38(1)(b) Aberdeenshire Council S38(1)(b) @aberdeenshire.gov.uk 01467 S38(1)(b) REPORT TO SENIOR LEADERSHIP TEAM – Banchory Devenick School – Heating System Failure 1.0 Introduction 1.1 This report identifies critical risks associated with the heating system at Banchory Devenick School, along with the school roll figures and outlines the future viability of the school. 2.0 Discussion Property / FM context 2.1 During December 2025, a routine inspection of the boiler system at Banchory Devenick School identified significant deterioration in two of the flues, which are now beyond permanent repair. A temporary repair has been undertaken to allow the school to remain operational in the short term. However, a full replacement of the flues is required as a matter of urgency to ensure the boilers can continue operating. Failure to replace the flues will result in the boilers being condemned and shut down. The estimated cost of replacing the flues is £10,000. Officers within Property and Facilities Management have been progressing a programme of works to address high‑risk oil pipes, following two oil pipe leaks in schools in recent years. Banchory Devenick School currently has an underground oil supply pipe, categorising it as high risk. The existing oil tank is also non‑compliant due to its current location and therefore should be relocated as part of the remedial works. The estimated cost for this element is approximately £55,000. The boilers were installed in 1990 and are now 26 years old, despite the recommended operational lifespan for such boilers being approximately 15 years. Replacement parts are no longer available, meaning any future failures would necessitate a complete boiler replacement. In the event of boiler failure, a transition to LPG would be recommended if site space allowed to eliminate risks associated with oil storage and to adopt a more environmentally sustainable solution. The estimated cost for a full boiler replacement is £180,000. Should the boilers fail before replacement is completed, temporary plant would be required to maintain school operations at a cost of approximately £1,500 per week with a set up and removal costs of circa £30,000; alternatively, it may be necessary to relocate pupils into a “school‑within‑a‑school” arrangement. Given the age of the boilers, the high risk of failure, the urgent flue repairs, and the required works to the oil tank and associated pipework, it is recommended that a full boiler replacement is undertaken. Any investment in flue, tank, or pipework repairs would become redundant if a boiler failure were to occur. In addition to the above, the flat roof has reached, or is close to reaching, the end of its expected lifecycle. Replacement within the next year is recommended at an estimated cost of £65,000. The electrical installation—including power, lighting, emergency lighting, and fire alarm systems—also requires full replacement at an estimated cost of £150,000. A further urgent requirement is the replacement of the water tank to ensure compliance with current water bylaws, at an estimated cost of £10,000. Furthermore, both the toilet facilities and the playground are nearing the end of their expected lifecycles and should be replaced within the next one to two years. Estimated costs are £75,000 for the toilet facilities and £50,000 for the playground. The table below provides a summary of the works and costs. Works Required Budget Cost Heating Upgrade £180,000 Water Tank Replacement £10,000 Flat Roof Upgrade £65,000 Electrical Upgrade £150,000 Toilet Upgrade £75,000 Playground Resurface £50,000 Total £530,000 Cluster capacity context 2.2 Considering available capacity within the cluster alone, as set out below, there is no operational requirement to repair or maintain Banchory Devenick School. The Portlethen Cluster consists of five primary schools; Banchory Devenick, Fishermoss, Hillside, Newtonhill and Portlethen Primary Schools. Table 1 below, shows that the Cluster has capacity for 1,738 pupils, and currently operating at 73% capacity, which is 476 spare places in 2029, equivalent to a two stream school. Table 1 Portlethen Cluster Capacity 2025 2026 2027 2028 2029 Total 1,738 1,271 1,248 1,225 1,232 1,262 Banchory Devenick School has a capacity for 70 pupils. Under Scottish Government Guidelines it is classed as Accessible Rural, the remaining schools within the cluster are classed as Accessible Small Town. School condition context 2.3 Banchory Devenick School has a condition grade of B and a suitability grade of A. The identified condition costs total £534,064. This included a boiler replacement, minor works to the toilet and a variety of smaller repairs. School roll context 2.4 The current roll at Banchory Devenick School is 28 pupils, of which 11 pupils reside within the catchment, 3 are zoned to other schools within Aberdeenshire and the remaining 14 pupils reside within Aberdeen City. The number of pupils per cohort is detailed in Table 2 below. Table 2 Cohort P1 P2 P3 P4 P5 P6 P7 S38(1)(b) Pupils The school is operating with two classes, P1-3 class of 14 pupils and a P4-7 class of 14 pupils. According to NHS Data there are 8 pupils due to start at the school between 2026 and 2028. Data trends show that on average several of children the in- zone choose schools out of the zone and there are OOZ applications from Aberdeen City families. If the school only had in zone pupils attending, the roll, would be on average between 11 and 13 pupils for the next four sessions. 2.5 2.6 2.7 According to SEEMiS there are 13 primary aged pupils who reside in catchment and attend Aberdeenshire schools. There are no planned housing developments within the catchment area. Banchory Devenick School has a servery kitchen; meals are provided by Portlethen Primary. Options for consideration There are 3 options for consideration for Banchory Devenick School Option 1: Progression of repairs and maintenance requirements This option does not give best value with considering the points made above regarding the pupils on roll and the capacity across the cluster. Option 2: Relocation of Banchory Devenick to other cluster school (“school-within-a-school”) Given the lack of available capital budget to progress the identified works above, and wider consideration of Best Value, it may be appropriate to consider the (permanent/temporary) relocation of Banchory Devenick School to another cluster school where there is adequate capacity. This could be actioned as an emergency situation then progressed through statutory consultation for closure. Option 2a- Relocate to Portlethen Primary Portlethen School has a capacity of 342, and a current roll of 210, operating at 61% capacity. It is approximately 4 miles from Banchory Devenick School. The school currently provides meals to Banchory Devenick School. Option 2b – Relocate to Fishermoss School Fishermoss School has a capacity of 358, and a current roll of 254, operating at 71% capacity. It is approximately 5.5 miles from Banchory Devenick School. The preferred option is 2b according to the QIM and QIO. Both of the options above would negate the requirement of a servery and both have kitchens. There is currently one transport contract for 11 pupils with a cost of £136.59 per day. This could be rerouted to either of the schools identified as options. – The existing transport contract for in zone pupils could be diverted to either of the two schools identified. Transport would also be provided for out of zone pupils living within Aberdeenshire. It would not be provided for pupils living within Aberdeen City. OR Transport for the out of zone pupils would only be provided to and from Banchory Devenick School, so parents would still need to transport their children to the school. 2.8 Staffing Table below indicates the staffing compliment at Banchory Devenick School. Head Teacher 1 FTE Teachers 1.3 FTE Permanent + 0.6 FTE Fixed Term PSA 20hrs Permanent, 25hrs Fixed Term (OLA funded) Catering Assistant 15 hours Permanent Janitorial tbc Admin 18 hours 3.0 Recommendation 3.1 3.2 3.3 3.4 Note the risks and the financial implications of the repairs. Give comment on the viability of the school. Confirm the preferred option and sub-option, if a relocation is required Confirm whether transport should be provided to Aberdeen City pupils should the relocation go ahead. In other circumstances transports has been provided to any pupil on roll at the time of temporary closure, but from the school, not from individual addresses, unless in zone. 4.0 Financial Implications 4.1 Capital and revenue implications of each option and sub-options Report by: , Learning Estates S38(1)(b) And S38(1)(b)Date: 8 January 2026 MT Report to SLT Date of Meeting: Title of Agenda Item: Responsible Person & Contact Details: Which Heads of Service/ Area Managers have seen sight of the finalised report Summary: 28 January 2026 Banchory Devenick School – Heating System Failure S38(1)(b) Learning Estates Team S38(1)(b) Anne Marie Davies MacLeod, Head of Resources and Performance Allan Whyte Head of Service, Property and Facilities Management This report identifies critical risks associated with the heating system at Banchory Devenick School, along with the school condition position, roll figures and Portlethen Cluster capacity. It also outlines the strategic and operational viability of the school and provides options for next steps. Background Papers: N/A Decision/Action required: Estimated Time to Cover 15 mins Item: All electronic papers should be forwarded to: S38(1)(b) Aberdeenshire Council S38(1)(b) @aberdeenshire.gov.uk 01467 S38(1)(b) REPORT TO SENIOR LEADERSHIP TEAM BANCHORY DEVENICK SCHOOL – HEATING SYSTEM FAILURE 1.0 Introduction 1.1 This report identifies critical risks associated with the heating system at Banchory Devenick School, along with the school condition position, roll figures and Portlethen Cluster capacity. It also outlines the strategic and operational viability of the school and provides options for next steps. 1.2 ECS LT considered this paper on 16 January 2026, and the decision was to proceed to SLT for information and advice on next steps. 2.0 Discussion 2.1 2.2 2.3 Property / FM context – Heating System During December 2025, a routine inspection of the boiler system at Banchory Devenick School identified significant deterioration in two of the flues, which are now beyond permanent repair. A temporary repair has been undertaken to allow the school to remain operational in the short term. However, a full replacement of the flues is required as a matter of urgency to ensure the boilers can continue operating. Failure to replace the flues will result in the boilers being condemned and shut down. The estimated cost of replacing the flues is £10,000. Officers within Property and Facilities Management have been progressing a programme of works to address high‑risk oil pipes, following two oil pipe leaks in schools in recent years. Banchory Devenick School currently has an underground oil supply pipe, categorising it as high risk. The existing oil tank is also non‑compliant due to its current location and therefore should be relocated as part of the remedial works. The estimated cost for this element is approximately £55,000. The boilers were installed in 1990 and are now 26 years old, despite the recommended operational lifespan for such boilers being approximately 15 years. Replacement parts are no longer available, meaning any future failures would necessitate a complete boiler replacement. In the event of boiler failure, a transition to LPG would be recommended if site space allowed to eliminate risks associated with oil storage and to adopt a more environmentally sustainable solution. The estimated cost for a full boiler replacement is £180,000. Should the boilers fail before replacement is completed, temporary plant would be required to maintain school operations at a cost of approximately £1,500 per week with a set up and removal costs of circa £30,000; alternatively, it may be necessary to relocate pupils into a “school‑within‑a‑school” arrangement. 2.4 2.5 2.6 2.7 Total Flat Roof Upgrade Electrical Upgrade Toilet Upgrade Playground Resurface £50,000 £65,000 £150,000 £75,000 £530,000 2.8 2.9 2.10 2.11 Given the age of the boilers, the high risk of failure, the urgent flue repairs, and the required works to the oil tank and associated pipework, it is recommended that a full boiler replacement is undertaken. Any investment in flue, tank, or pipework repairs would become redundant if a boiler failure were to occur. School condition context In addition to the above, the flat roof has reached, or is close to reaching, the end of its expected lifecycle. Replacement within the next year is recommended at an estimated cost of £65,000. The electrical installation, including power, lighting, emergency lighting, and fire alarm systems also requires full replacement at an estimated cost of £150,000. A further urgent requirement is the replacement of the water tank to ensure compliance with current water bylaws, at an estimated cost of £10,000. Furthermore, both the toilet facilities and the playground are nearing the end of their expected lifecycles and should be replaced within the next one to two years. Estimated costs are £75,000 for the toilet facilities and £50,000 for the playground. Table 1 below provides a summary of the works and costs. Table 1 – Summary of works and costs Works Required Budget Cost Heating Upgrade Water Tank Replacement £180,000 £10,000 The most recent condition and survey reports show that Banchory Devenick School is graded ‘B’ for condition and ‘A’ for suitability. Strategic Review The Learning Estates Strategy – Movement Towards a Sustainable Estate was approved at ECS Committee on 1 February 2024. The strategy aims to have a best value estate with financially sustainable provision. As part of each stage of the review officers compare building capacity with pupil numbers within each cluster to ensure population aligns with capacity. Officers are progressing with Phase 3 of the review. However, the strategy allows flexibility enabling officers to respond to emerging issues. The original plan was to include the Portlethen Cluster within Phase 4 of the review. The viability of Banchory Devenick School would have been assessed at that point and it is likely that option 4 below, would have been a recommendation as there is no strategic requirement to retain Banchory Devenick School. Cluster capacity context 2.12 Considering available capacity within the cluster alone, as set out below, there is no operational requirement to repair or maintain Banchory Devenick School. 2.13 The Portlethen Cluster consists of five primary schools, Banchory Devenick, Fishermoss, Hilliside, Newtonhill and Portlethen Primary Schools. 2.14 Table 2 below, shows that the Cluster has capacity for 1,738 pupils, and currently operating at 73% capacity. It is predicted by 2029, there will be 475 spare primary places, which is equivalent to a two stream school. Table 2 School Capacity 2025 2026 2027 2028 2029 Banchory Devenick 70 26 27 27 28 30 Fishermoss 358 256 261 251 235 221 Hillside 509 444 405 377 360 364 Newtonhill 459 338 353 365 399 422 Portlethen 342 212 206 205 210 227 Total 1738 1276 1251 1227 1232 1263 2.15 Banchory Devenick School has a capacity for 70 pupils. Under Scottish Government Guidelines it is classed as Accessible Rural (areas with a population of less than 3,000 people, and within a drive time of 30 minutes to a settlement of 10,000 or more). 2.16 2.17 The remaining schools within the cluster are classed as Accessible Small Town (settlements of 3,000 to 9,999 people, and within a 30 minute drive time of a settlement of 10,000 or more) The map and Table 3 below shows the schools approximate distance from Banchory Devenick School. Distance Table 3 – Distance from Banchory Devenick School School 3.5 miles Fishermoss School 5.5 miles Hillside School 2.18 Portlethen Primary School 4 miles Aberdeen City 3 miles School roll context The current roll at Banchory Devenick School is 26 pupils (23 families), of which 9 pupils reside within the catchment, 4 are zoned to other schools within Aberdeenshire and the remaining 13 pupils reside within Aberdeen City. The number of pupils per cohort is detailed in Table 4 below. Table 4 2.19 2.20 2.21 2.22 2.23 2.24 Cohort P1 P2 P3 P4 P5 P6 P7 Pupils S38(1)(b) The school is operating with two classes, P1-3 class of 12 pupils and a P4-7 class of 14 pupils. According to NHS Data there are 8 pupils due to start at the school between 2026 and 2028. Data trends show that on average several of children the in- zone choose schools out of the zone and there are OOZ applications from Aberdeen City families. The primary enrolment period was between 12 and 16 January 2026, there was one in zone enrolment and one placing request with a sibling link from Aberdeen City. According to SEEMiS (19 January 2026) there are 13 primary aged pupils residing within the Banchory Devenick School catchment area, of which 9 attend the school. The remaining pupils either attend Fishermoss, Hillside or Portlethen Primary School. If the school only had in zone pupils attending, the roll, would be on average between 9 and 11 pupils for the next four sessions, which is shown in Table 5 below. Table 5 – SRF – Banchory Devenick School In Zone Pupils Year 2025 2026 2027 There are no planned housing developments within the catchment area. 2.25 Banchory Devenick School has a servery kitchen; meals are provided by Portlethen Primary. 2028 2029 In Zone Pupils 9 9 9 11 11 2.26 2.27 2.28 2.29 2.30 2.31 2.32 2.33 2.34 Options for consideration There are 4 options for consideration for Banchory Devenick School, which are detailed below; Option 1: Status Quo This option would be to do nothing more than the existing temporary repair to Banchory Devenick School. This was only progressed as an emergency repair on the basis that the full repair would be carried out timeously. Therefore, there would be health and safety implications and significant reputational risks if this timescale was not adhered to. Officers would not recommend this approach. Option 2: Progression of repairs and maintenance requirements This option would see the urgent repairs required carried out as a priority with the boiler upgrade and water tank replacement, totalling £190k carried out over the next 12 months. The remainder of the works totalling £340k to be carried out during year 2. This does not give best value when considering the points made above regarding the pupils on roll and the capacity across the cluster. Option 3: Relocation of Banchory Devenick School pupils to a cluster school as “school within a school” (SWS) and begin statutory consultation for closure. This could be actioned as an emergency response/action to the situation then progressed through statutory consultation for closure. Officers would recommend this option if the boiler breaks prior to a longer term solution being decided upon. A ‘school within a school’ allows for the pupils and staff to stay together and be educated within another school building. ECS has previously taken this approach during the oil leak at Gartly School and the roof collapse at Slains School. Option 3a - Relocate as SWS to Portlethen Primary Portlethen School has a capacity of 342, and a current roll of 210, configured across 9 classes of their available 12 classrooms. The school currently provides meals to Banchory Devenick School. Option 3b – Relocate to SWS to Fishermoss School Fishermoss School has a capacity of 358, and a current roll of 254, configured cross 10 classes of their available 12 classroom spaces. 2.35 2.36 2.37 2.38 2.39 2.40 2.41 2.42 2.43 2.44 Initial conversations with both the QIO, Fiona Thompson and QIM, Paul Rooke suggest that operationally Option 3b would be preferred. Both of the options above would reduce the requirement for school meals to be delivered across the cluster. School Transport There is currently one transport contract to Banchory Devenick School for 11 pupils with a daily cost of £136.59. This existing transport contract for in zone pupils could be diverted to either of the two schools identified. Transport would also be provided from Banchory Devenick School to either Portlethen Primary or Fishermoss School for the remaining out of zone pupils. Parents would still be required to transport their children to and from Banchory Devenick School. Option 4: Temporary Closure and begin statutory consultation for permanent closure. Given the lack of available capital budget to progress the identified works above, and wider consideration of Best Value, it may be appropriate to consider the temporary then subsequent permanent closure of Banchory Devenick School. All pupils who currently attend Banchory Devenick School will be offered the following schools as an alternative. Fishermoss School Hillside School Portlethen Primary School School Transport Children zoned to Banchory Devenick School will be entitled to home to school transport. Children residing within Aberdeenshire outwith the Banchory Devenick School catchment will be entitled to transport from Banchory Devenick School. Children residing within Aberdeen City will not be entitled to school transport. Staffing Table 6 below indicates the staffing compliment at Banchory Devenick School. Janitorial and cleaning staff are allocated as a cluster resource. Table 6 – Current Staffing Staff Hours (FTE) Head Teacher 1 FTE Teachers PSA 20hrs Permanent, 25hrs Fixed Term (OLA funded) Admin 18 hours 1.3 FTE Permanent & 0.6 FTE Fixed Term Catering Assistant 15 hours Permanent 3.0 Recommendation 3.1 3.2 3.3 Note the risks and the financial implications of the repairs to Banchory Devenick School. Provide comment on the viability of the school. Decide the preferred option and instruct officers on next steps. 4.0 Financial Implications 4.1 Capital and revenue implications of each option and sub-options will be determined in future reports. Report by: S38(1)(b) S38(1)(b) Date: 22 January 2026 , Learning Estates and Options Appraisal Checklist Summary information to be provided for each factor – or marked N/A – and signed off when complete Factors Number of Schools Potentially Affected Project: School within a School: Emergency response Two – Banchory Devenick and receiving school for decant Date/ Initials Primary / Secondary Primary Same Cluster or Cross Cluster Impact Same cluster Drivers Pupil Safety – deterioration of boiler flue – school may need immediate decant or works after the xmas break School Roll Forecast Summary 12-12- 25 12-12- 25 12-12- 25 12-12- 25 12-12- 25 28 on roll – two classes of 14 each (P1-3 and P4-7) Roll potentially remaining static or increasing but this is largely due to OOZ requests from ACC. 13 pupils total living in zone. 8 pupils in NHS data from 2026 to 2028. All current P1s are ACC Option 1 – Portlethen Primary Portlethen Primary has 210 on roll with capacity of 342. 9 classes and 12 class capacity. Sufficient capacity for temporary school within a school Option 2 – Fishermoss School Current roll 254 with capacity of 358. 10 classes this session and 12/13 class capacity. Sufficient capacity for temporary school within a school. Housing Summary No housing in Banchory Devenick catchment Placing Request Summary 12-12- 25 12-12- 25 Majority of roll are Aberdeen City pupils on placing requests. 10 in zone pupils, 2 others from Aberdeenshire, 16 pupils OOZ and OOA – Aberdeen City. Building Factors – Suitability or Condition Transport Implications Condition – Grade B Condition costs £534,064 Suitability Grade A 1 contract – 11 pupils £136.59 per day. This could be re-routed to PPS Catering Implications Currently a servery- meals from Portlethen Primary 12-12- 25 12-12- 25 12-12- 25 Financial Implications Staffing Implications Risks of Proceeding Risks of Not Proceeding Informal Discussions with HT Informal Discussions with QIO/QIM Discussed with HoS Initial Discussion with PC Chair/Vice SLT Briefing Paper SWOT Analysis – Number of options & outcome Range of Educational Benefits Identified? Place and Wellbeing Assessment Integrated Impact Assessment If boiler flues can be replaced this would be cost of c. £15k if full boiler replacement required this is IRO £180k. Costs will also be involved for transportation of pupils to school within a school, value tbc. Head Teacher – , QIO – . QIM – F/T Perm 35 1.00 HT P/T Perm 21 0.60 P/T Perm 24.5 0.70 P/T Fixed 21 0.60 PSA - Core: 20.0 hours permanent OLA funded: 25.0 hours fixed term Catering Staff – 1 catering assistant (Catering Officer to be point of contact w/c 15/12) Janitorial Admin Staff – 1 x 18hrs ( senior admin covering) Transition of pupils to another school – associated transport changes Safety risks Discussion prior to end of term suggested that Fishermoss would be preferable to Portlethen for potential decant. 12-12- 25 12-12- 25 12-12- 25 12-12- 25 6-1-26 12-12- 25 Scoring School(s) Baseline Suitability Condition Option Strengths Weaknesses Opportunities Threats S W O T Total Option- - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Option- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Option- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Option- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Option- - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 FOI audit form - To be completed detailing the actions and decisions taken in responding to an FOI request. This form should be saved into the AXLR8 Files relating to the request before closure, along with all emails and other correspondence. AXLR8 reference AbdnShireIR: 44563 Check here if no search carried out / no search required. Name of system searched Search criteria Searched by Date searched Learning Estates Sharepoint Banchory-Devenick 07/09/2026 Learning Estates Emails Banchory-Devenick LE Team 07/09/2026 Officer knowledge and expertise. The officers carrying out the search are the ones undertaking the assessment 07/09/2026 and assessing options. They know that this was not created and therefore is not held FOI audit form v1.2 March 2022